Address: 415 Mission St, S.F.
Neighborhood: SoMa (South of Market)

Classification: Commercial Office, Retail
Floors: 61 Stories
Built: 2013 (Construction Started) 2018 (Completed)
Owned by: Envirotech

The notorious Vale Tower is the corporate headquarters of Envirotech and many of its subsidiaries, is a 61-story skyscraper located in the SoMa (South of Market) neighborhood of San Francisco. The tower, completed in 2018, stands as a symbol of Envirotech’s dominance in the technology and environmental engineering sectors. It is also known for its iconic design and the numerous controversies surrounding its construction and ownership.

History

Construction of Vale Tower began in 2013 and was completed in 2018. The project was initiated as part of Envirotech’s expansion strategy, aiming to centralize its operations in a single, state-of-the-art facility. The tower has since become an iconic feature of the San Francisco skyline, representing the power and influence of Envirotech in the region.

Design

Vale Tower is a marvel of modern architecture, featuring sleek, eco-friendly design elements that reflect Envirotech’s commitment to environmental sustainability. The building is equipped with advanced energy-efficient systems, including solar panels, green roofing, and a rainwater harvesting system. The interior design incorporates open-plan offices, collaborative workspaces, and state-of-the-art technology to foster innovation and productivity.

Envirotech Campus


In addition to Vale Tower, Envirotech maintains a sprawling campus in Silicon Valley. The Silicon Valley campus serves as a hub for research and development, housing cutting-edge laboratories and innovation centers. The relationship between the two facilities is symbiotic, with the Silicon Valley campus focusing on technological advancements and Vale Tower serving as the administrative and strategic command center.

Controversies

Despite its impressive design and technological advancements, Vale Tower has been mired in controversy since its inception. Allegations of improper land acquisition and construction permits have plagued the project, with accusations that Envirotech leveraged its political influence to fast-track approvals. Additionally, concerns about the working conditions within the tower and the environmental impact of its construction have drawn significant criticism from activists and local residents.

Media